Roll-out of full fibre broadband in the UK
![]() |
This ICE insights paper examines the roll-out programme for full-fibre and gigabit-capable broadband. It considers the potential economic and social benefits, delivery challenges and the potential for alternative approaches. |
Contents |
[edit] Introduction
A major infrastructure programme – the installation of full-fibre and gigabit-capable broadband to every home and business across the UK – is planned to be near complete.
As ICE’s new insights paper on the rollout of full-fibre broadband reveals, this is an incredibly ambitious target. When the Future Telecoms Infrastructure Review was released in 2018, the then Government under Theresa May aimed to ensure a full-fibre-to-the-premises (FTTP) network would be in place by 2033. The new target – of 2025 – is a full eight years earlier than planned just two years ago.
[edit] The engineering challenges
A new fibre-optic network is capable of delivering much faster upload and download speeds for households and businesses. Without it, next generation technology, including mobile 5G, will struggle to perform. Fibre is also more reliable than existing copper cables, with performance more resilient to weather or electromagnetic interference.
Installing it to every home and business is first and foremost a massive engineering challenge. It will mean new trenches dug into many residential streets in the UK and new ducts and poles crisscrossing – and connecting – the nation.
[edit] Enabling a digital economy
A full-fibre network would have wide-ranging economic impacts. Openreach believes it will boost the economy by some £60 billion by 2025, enabling some people not in the workforce to re-enter work, and support more people to work remotely. This economic and speed stimulus is desperately needed in a world which is more interconnected. While the UK has an impressive 95% coverage for super-fast broadband, just 8% of the country is covered by fibre connectivity. When 28% of France, 71% of Spain and 97% of Japan has access to fibre-enabled broadband, Britain is at risk of falling far behind in the global race.
Fibre does not just add speed – it also adds capacity. As the country grows, as technology develops and as more information flows, it is important to avoid bottlenecks. Full-fibre would also have a profound impact on economic infrastructure. Building Information Modelling, digital twins and remote monitoring will all benefit from increased speed, connectivity and reliability. Tomorrow’s engineers will design, build, collaborate and improve infrastructure assets in real time, from anywhere in the world.
[edit] Are there better ways to connect the UK?
ICE’s paper also examines alternative pathways for delivering enhanced Internet connectivity. These include Canada’s plans to link up its communities using low earth orbit satellites and how 5G could be leveraged to better connect homes to the fibre network.
Readers can view ICE’s Insight paper here – Civil engineering insights on the rollout of full-fibre broadband and alternative proposals.
[edit] About this article
This article was written by ice.org.uk Ben Goodwin, Lead Policy Manager at the Institution of Civil Engineers (ICE). It previously appeared on the ICE website in January 2020 under the title 'Civil engineering insights into the roll-out of full-fibre broadband in the UK' and can be accessed HERE.
Other articles by the ICE on Designing Buildings Wiki can be accessed HERE.
[edit] Related articles on Designing Buildings
- Broadband universal service obligation (USO).
- Designing smart cities.
- Digital Built Britain.
- Electrotechnical industry gears up for All-IP switch.
- How to make the digital revolution a success.
- Information and communications technology.
- Rural.
- Rural productivity plan.
- UK Digital Strategy.
- Vital infrastructure and redevelopment.
Featured articles and news
One of the most impressive Victorian architects. Book review.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.